Project Challenge:
A 40 year old San Francisco hospital wanted to construct four loading dock bays which would match the architectural details and finishes of the original building.
Solution:
By constructing custom formwork and matching the existing integral colored concrete, Lewis Merlo, Inc. was able to create an efficient new loading dock area which looks as if it is part of the original structure.